Party Wall Notices Online

Surveyor Reviewed Party Wall Notices

On this page you will be able to get professional, fully compliant Party Wall Notices quickly and easily.

How it works

  1. Choose the notice you require and select appropriate the form below.
  2. Complete the short form with the information required.
  3. We will then review the information and prepare your party wall notice.
  4. Once complete we will then either email you the notice, or post it out on your behalf.
  5. All notices are prepared within 24 hours unless further information is required.

To start, simply select one of the forms below depending on which notice you require and a Chartered Surveyor will then prepare your party wall notice for you. If you do not know which notice you require, you can either review the guidance on this website, or use our full service.

GET STARTED NOW GET PARTY WALL QUOTE

contact@murrins.co.uk
0203 488 2909

An RICS Regulated Surveying Firm

The form will take about 5 – 10 minutes to complete. Once you have completed it, one of our surveyors will review the information provided and prepare your party wall notice. Once the notice is complete he will then email the completed notices over to you, ready to send, or post them for you.

If there are any problems along the way our surveyor will contact you to make sure everything is in order.

If he believes you have made a mistake he will contact you to let you know.


 

Note: It is essential that the information you provide in the notices is accurate. Our surveyor will enter the information that you have provided in the form exactly as you have provided it. Any error or inaccuracy in the information you provide will invalidate your notice, and Murrins Ltd will hold no liability for this. Liability for the accuracy of the information provided lies with you. If you would prefer to speak to a surveyor, please contact us.

 

If you require a notice other than a Party Structure Notice, click the “-” symbol next to “Party Structure Notice” to minimise it and select the appropriate notice.

Before you start, please familiarise yourself with the guide on how to complete your notice, below:

Guidance on how to complete your party wall notices can be found below:

How to complete your party wall notices

 


Party Structure Notice Form

Complete the form below to serve a Party Structure Notice.

Adjacent Excavation Notice Form

Complete the form below to serve an Adjacent Excavation Notice.

Line of Junction Notice

Complete the form below to serve a Line of Junction Notice.

Different Types of Party Wall Notices

The types of notice are:

  1. Party Structure Notice: covering works directly to the party wall or structure.
  2. Line of Junction Notice: covering new building on, or next to the boundary line.
  3. Adjacent Excavation Notice: covering excavations near to neighbouring property.

Party Structure Notice

If you plan to do works covered by the Party Wall Act directly to a party wall or structure, then you must serve a Party Structure Notice at least 2 months before the works commence.

Works covered by a Party Structure Notice include

  • Underpinning, thickening or raising a party structure.
  • Making good, repairing, demolishing or rebuilding a party structure.
  • Cutting into a party structure, for any purpose such as inserting flashings, beams etc.
  • Cutting away from a party wall
  • Works to ceilings and floors that separate flats.

Line of Junction Notice

Line of Junction Notice: If you are building on, or immediately adjacent to, the boundary line with another property, you must serve a Line of Junction Notice at least on month before you start the construct the wall.

Adjacent Excavation Notice

Adjacent Excavation Notices are required when you intend on excavating for any reason close to neighbouring property. More specifically they are required in the following cases:

3m Adjacent Excavation Notice: If you are excavating, for any purpose, within 3m of a neighbouring property, AND to a depth greater than the neighbouring property’s foundations, you must serve an Adjacent Excavation Notice at least 1 month before the excavation starts.

6m Adjacent Excavation Notice: If you are excavating, for any purpose, within 6m of a neighbour property, AND to a depth greater than the path formed by drawing a diagonal line at a 45 degree angle downwards from the base of the neighbouring property’s foundations, you must serve an Adjacent Excavation Notice at least 1 month before the excavation starts.